Skip to content
Themewinter Logo
  • Home
  • About
  • Our Products
    • Eventin
    • WPCafe
    • WP Timetics
    • Poptics New
    • Booktics New
  • Blog
  • Deals
  • Login
Popular Search ticketqr codeemailtranslatelocation

Authorsy

  • Introduction
  • Getting Started
    • Introduction
    • Plugin installation
    • License
  • Author Box
    • Add New Author
    • Author Settings
  • Voting
    • Voting
  • Shortcodes
    • ShortCode
  • Translation
    • Translation with Loco Translate

Eventin

  • Introduction of Eventin
  • Gettings Started
    • Introduction of Eventin
    • How to install Eventin Plugin
    • How to Upgrade Eventin Free to Pro Version
    • How to Activate Eventin License
    • Quick Start Guide
  • General Settings
    • General Settings for Eventin
    • How to Change Event & Speaker Slug
    • How to Create a Webhook for Events (Pro)
    • How to Use Embeddable Scripts in Events(Pro)
    • How to Manage Role-Based Access in Eventin
    • Getting support
  • Events
    • How to Create Event in Eventin
    • How to Create Event Categories and Tags
    • How to Assign Categories and Tags to Events
    • How to Create Event Ticket Variations
    • How to Create Recurring Event in Eventin
    • How to Check Event Report
    • How to Customize the Eventin Event Page with Elementor
    • How to Use WooCommerce Coupon for Events
    • How to insert Event Location in Eventin
    • How to Submit Events from the Front End in Eventin
    • How to Create a Hybrid Event in Eventin
  • Event Attendees
    • How to Enable Event Attendee Registration
    • How to Add Attendee Extra Fields
    • How to Generate and Scan QR code(Pro)
    • How to Purchase Tickets on Eventin
    • How to Set a Countdown Timer for Ticket Purchases in Eventin
    • How to Send Event Certificates
    • How to Manage Attendees in Eventin
    • How to Manage Booking of Events
    • How to Add Attendees Manually (Pro)
    • How to View Event Bookings on the Frontend
  • Email Settings
    • How to Configure Confirmation Email for Event
    • How to Configure Reminder Email for Event
    • How to Configure RSVP Email
    • Email Automation Workflow Builder
  • Speakers and Organizers
    • Introduction of Eventin Speaker & Organizer
    • How to Create Eventin Speaker
    • How to Create Eventin Organizer
    • How to assign speakers on schedules
    • How to assign a speaker/organizer on events
  • Schedules
    • Introduction of Eventin Schedules
    • How to Create Eventin Schedule
    • How to Assign Schedule on Events
  • Payment Type
    • Which payment methods are supported by Eventin?
    • How to Configure the WooCommerce in Eventin
    • How to Configure the Stripe Payment Gateway in Eventin (Pro)
    • How to Configure the PayPal Payment Gateway in Eventin
    • How to Configure the Local Payment in Eventin
    • How to Configure SureCart in Eventin
  • Shortcodes & Widgets
    • Available Shortcodes & Widgets in Eventin
    • How to Use Eventin Shortcodes
    • Elementor Widgets in Eventin
    • Event Calendar View In Eventin
  • RSVP Events (Pro)
    • What is RSVP Event
    • How to Create RSVP in Eventin
    • RSVP Attendee Report
    • How to send RSVP invitations
  • Visual Seat Map
    • How to Create Event with Visual Seat Map in Eventin
  • Integration
    • How to Integrate FluentCart with Eventin
    • How to Integrate Eventin with Bit Integrations
    • How to Integrate Eventin with Bit Flows
    • How to Integrate Eventin with OttoKit (formerly SureTriggers) to Automate Event Workflows
    • How to Integrate WowRevenue with Eventin
    • How to Integrate Oxyzen Builder with Eventin(Pro)
    • How to Integrate Bricks Builder with Eventin(Pro)
    • How to Integrate DIVI Builder with Eventin
    • How to Integrate FluentCRM with Eventin (pro)
    • How to Integrate Calendar with Eventin (Google, Apple etc)
    • How to Integrate Pabbly with Eventin
    • How to Integrate Twilio SMS Remindar with Eventin
    • How to Integrate Zapier with Eventin
    • How to Integrate BuddyBoss with Eventin(Pro)
    • How to Integrate Zoom Module with Eventin
    • How to Integrate Google Meet with Eventin (Pro)
    • How to Integrate Artificial Intelligence (AI) with Eventin (Pro)
    • How to Integrate Dokan with Eventin for Multivendor Events( Pro)
    • How to Integrate SEO Plugin with Eventin
    • Automate Eventin Bookings with Make.com Webhooks
  • Templates
    • How to Override Email Template
    • How to Change Event Templates
    • How to Change Speaker Templates
    • How to Change Ticket Templates
    • How to Override Event Template
    • How to Override Speaker Template
    • How to Override Archive Page
  • Template Builder
    • How to Create Custom Event Landing Pages in Eventin (Pro)
    • How to Create Event Ticket Templates in Eventin (Pro)
    • How to Create Event Certificate Templates in Eventin (Pro)
  • Translations
    • Which languages are supported in Eventin?
    • Which translation plugins are supported in Eventin?
  • Rollback V4 to V3
    • Rollback V4 to V3
  • Troubleshooting
    • Admin Email Showing in Public Source Code
    • Ticket Email Sent from WordPress
    • ACF Field Support
    • How to Fix 404 issue on Event Page

General

  • How to Cancel Your Subscription

Optiontics

  • What is Optiontics?
  • How to Create Product Options

WPCafe

  • Introduction to WPCafe
  • Getting Started
    • How to install the WPCafe Plugin
    • License
    • Plugin Uninstallation
    • Oxygen Builder Elements
    • Searching Products with Pickup/Delivery(Pro)
    • WpCafe Elementor Widgets
  • Translation
    • How to Translate WPCafe
  • Product Addons
    • Product Addons (Pro)
  • Rollback V2 to V3
    • How to Roll Back to an Older Version of WP Cafe
  • Email Settings
    • How to Automate Reservation Emails in WPCafe
  • Troubleshooting
    • Slug Change
  • General settings
    • WpCafe Shortcode
    • Theme Compatibility
    • User Roles and Permissions
    • General Settings for Date and Time
    • Get Support
  • Food Ordering
    • General Settings For Location
    • Add New Food Menu
    • Food Ordering with QR code(Pro)
    • Add Food Category and Tag
    • Minicart
    • Tipping (Pro)
    • Discount(Pro)
    • Special Menus(Pro)
    • Live Order(Pro)
    • Pickup (Pro)
    • Delivery (Pro)
    • Order Bumps
  • Reservation
    • General Settings for Reservation
    • Form Customization
    • Notification Email
    • Schedule
    • Email Settings
    • Reservation with Food Ordering (PRO)
    • Visual Table Selection
  • Integrations
    • FluentCRM Integration
    • Zapier Integration
    • Pabbly Integration
    • Food delivery ( Ship day ) plugin integration
    • Twilio SMS Integration
    • WooCommerce Clover POS Integration
    • Loyalty Program Points & Rewards for Food Orders
    • Multivendor Addon
  • WPCafe Version-3
    • How to Integration Twilio SMS with WPCafe
    • How to Integrate Clover POS with WPCafe
    • How to Integrate Pabbly with WPCafe
    • How to Integrate Zapier in WPcafe
    • How to Integrate Fluent CRM with WPCafe
    • How to Customize Table Layout in Reservation
    • How to Generate QR Codes for Food Menu
    • How to Show Food Menu by Location in WPCafe
    • Email Automation Workflow Builder in WPCafe
    • How to use shortocde on WPCafe
    • How to Add Discounts Using WPCafe
    • How to Set Up Tipping Using WPCafe
    • Onboarding
    • How to Add & Manage Food Categories
    • How to Add and Manage Product Tags
    • How to Add & Manage Brands
    • How to Add and Manage Food Menu in WPCafe
    • How to Manage Restaurant Locations in WPCafe
    • How to Manage Global Schedule Settings
    • How to Setup Pickup for Food Ordering in WPCafe
    • How to Setup Delivery for Food Ordering in WPCafe
    • How to Enable Mini Cart in WPCafe
    • How to Enbale Sound Notification in WPCafe
    • How to Use Time Based Products in WPCafe
    • How to Configure Reservation Settings in WPCafe
    • How to Customize the Reservation Form in WPCafe
    • How to Display the Reservation Form
  • Style Settings
    • Style Settings
  • Delivery Module(Pro)
    • General
    • Add Food Store’s Location on Google Map(Pro)
    • Google autocomplete address in the checkout(Pro)
    • Minimum order amount to place order(Pro)
  • Home
  • Docs
  • WPCafe
  • WPCafe Version-3
  • How to Setup Delivery for Food Ordering in WPCafe
View Categories

How to Setup Delivery for Food Ordering in WPCafe

The Delivery feature in WPCafe allows customers to order online and receive deliveries at their convenience, with flexible global or branch-wise schedules for efficient order management.

Step 1: Enable the Delivery Module #

Go to WPCafe → Settings & Tools → Modules, enable Delivery, and click Save Changes. All delivery settings will now appear under Settings → Delivery.

Step 2: Set Delivery Schedule #

Go to Settings → Schedule, set Time Intervals, and configure the Weekly Schedule:

  • Switch a day On to make it available.
  • Select Start/End Time and click Add Slot for multiple windows.
  • Leave a day Off to mark it Closed.

Step 3: Global Delivery Settings #

  • Minimum Order & Prep Time: Set minimum spend and preparation time.
  • Delivery Orders: Enable delivery to customer addresses.
  • Delivery Date & Time: Allow date and time selection at checkout.
  • Delivery Message: Add custom instructions or messages for customers.

Step 4: Location-Wise Delivery Schedule #

For multiple branches:

  1. Go to Settings → Locations → [Select Location]
  2. Enable Override Default Schedule
  3. Set weekly schedule like in Step 2 and Save Changes

Follow the documentation for location-based delivery settings..

Frontend View #

Customers can select the Delivery Date & Time during checkout.

Frequently Asked Questions (FAQ) #

Q1: How early should I place a Delivery order?
A1:
Delivery orders should be placed according to the Minimum Preparation Time set in Settings → Delivery.

Q2: What kind of time slots are available?
A2:
Delivery slots are created based on Time Intervals, and multiple delivery windows can be set for each day in the Weekly Schedule.

Q3: What messages or instructions can be shown to customers?
A3:
In the Delivery Message, you can provide delivery address details, special notes, or any other instructions for the customer.

Conclusion: #


The Delivery feature allows customers to have their orders delivered directly to their addresses. It supports branch-wise scheduling and simplifies delivery timing and order management.

What are your Feelings

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Updated on October 27, 2025
How to Setup Pickup for Food Ordering in WPCafeHow to Enable Mini Cart in WPCafe
Table of Contents
  • Step 1: Enable the Delivery Module
  • Step 2: Set Delivery Schedule
  • Step 3: Global Delivery Settings
  • Step 4: Location-Wise Delivery Schedule
  • Frontend View
  • Frequently Asked Questions (FAQ)
  • Conclusion:
Copyright © 2013-2026 ThemeWinter. – A Brand of Arraytics.